Hexagon Mining Underground Pro Project Management

As the lead consultant, our responsibility was to manage the entire process of implementing and testing the Hexagon Mining underground (UG) Pro production management system in a copper-zinc producing underground mining operation. Gosselin Mining consulting engineer worked closely with the client, stakeholders and coordinated with the vendor to develop a comprehensive testing plan that would ensure the system's quality, performance, and functionality. We also provided regular status updates, identified issues, and tracked the resolution of problems during testing.

Location
Sweden
Year
2020-2021
Hexagon Mining Underground Pro Project Management

Summary

Hexagon Mining underground (UG Pro) production management system underwent a rigorous test and project management process to ensure that the project outcomes were validated and met the desired standards. The main aim was to evaluate the functionality and reliability of the system, ensuring that the system was able to perform the core production management functions efficiently. The testing process involved running several tests on the system's surface to check for its functionality and capability to manage production activities. During the project management process, the team summarized the flow in the production management system, which involved documenting and analyzing the various processes involved in managing production activities. This helped identify loopholes and areas that needed improvement to optimize the production management process. The overall objective was to ensure that the UG Pro production management system was reliable, efficient, and scalable, facilitating better production management and improved productivity.

  •  

« Took control of the project and got us to a good position for decisions »
Craig Griffiths, Mine Manager Zinkgruvan, Lundin Mining
« Easy to cooperate during the project »
Morgan Karlsson, IT Engineer, Zinkgruvan Mining

Our challenges

The Covid-19 pandemic has posed a number of challenges for project management, particularly when it comes to coordinating with clients and third-party suppliers. With travel restrictions in place, many organizations have been forced to rely on virtual communication channels to ensure that projects are delivered on time. This has required a great deal of adaptability and flexibility, as well as a commitment to stay on top of deadlines and ensure that all stakeholders are kept up to date. Additionally, it is important to ensure that project outcomes are of the highest quality possible, which means carefully analyzing test results and drawing on state-of-the-art expertise to suggest a way forward that will guarantee reliable and excellent outcomes.

This requires not only technical know-how but also strong communication skills and a deep understanding of client needs. Despite these challenges, it is possible to overcome them and deliver successful projects that meet or exceed client expectations.

Our solutions

At Gosselin Mining consulting engineer, we oversaw the implementation of the underground mine production system and provided training to the mine's staff to ensure efficient and effective utilization of Hexagon Mining underground production. Through our collective efforts with the client's team, we were able to successfully complete this project, providing the mine with a way forward for implementation of an effective production management system suited with Zinkgruvan Mining overall productivity and streamlined their operations.

We pride ourselves on our excellent customer service, and believe in taking a collaborative approach to ensure that your goals are met with the highest level of workmanship. We take the time to fully understand the details of your project, so that our solutions are tailored to your individual requirements.

Gosselin Mining consulting engineer's local presence in combination with our international expertise provided the client a competitive advantage to kickstart the underground mining proudction system evaluation. Our consulting mining engineer understood and navigated teh challenges and opportunities present in the evaluation of Hexagon Mining underground production system. We recommended specific and measurable recommendations and insights to Zinkgruvan Mining on moving forward in their implementation of underground mining production monitoring technology based on their mining company needs and requirements.

Project highlights

  • Successfully completed project within deadline

  • Client satisfaction achieved

  • Assisted client in making crucial technology development decision

  • Expertise in machine control

  • Effective project management

  • Local presence combined with global knowledge

Have a similar project?

Contact us and we will help you find the solution for your project.

Ask an expert

Related projects

Rana Gruber iron ore mine technical report

Open pit and underground PERC mineral reserves technical report for stock exchange listing requirements.

Kolsvik gold feasibility study

Bindal Gruver's kolsvik gold project feasibility study: Proven know how results