Gosselin mining headerPre-Feasibility & Feasibility Studies (PFS/FS)

Pre-Feasibility & Feasibility Studies (PFS/FS)

Bankable engineering for Nordic/EU projects. We convert concepts into detailed designs, vetted schedules and cost estimates, integrate geotech and tailings to GISTM, lock data and QA, and deliver lender-friendly economics, risks and execution plans that support investment decisions.

Request more information

From concept to bankable design

PFS/FS mature designs (open-pit phases/ramps/slopes; UG access/stoping/ventilation), calibrate haulage and availability, and assess electrification for Nordic climates. If gaps remain, we pull requirements from the mining project evaluation and risk assessment to close them before lender review.

Schedules, costs and governance lenders trust

We deliver LOM schedules that balance grade, strip and plant constraints, and cost estimates with owner’s/contingency/escalation and vendor input—feeding project valuation. Disclosure packages are prepared with compliance to NI 43-101 & JORC so the study is publishable and audit-ready.

Outcome

What you get:

You receive a coordinated, bankable package: design drawings (open-pit phases or underground access/stoping and ventilation), a calibrated life-of-mine schedule, and transparent CAPEX/OPEX with owner’s, contingency and escalation—backed by vendor inputs and a documented Basis of Estimate. A ranked risk register links likelihood/consequence to clear mitigations and monitoring KPIs, and an execution plan outlines procurement, permitting, HSE, tailings (GISTM), commissioning and ramp-up.

Gosselin mining image text

Our projects

Sweden

Woxna graphite mine preliminary economic assessment

NI43-101 PEA Technical Report on Mineral Resources Estimate of Woxna Graphite Kringelgruvan.

Norway

Rana Gruber iron ore mine technical report

Open pit and underground PERC mineral reserves technical report for stock exchange listing requirements.

Finland

Sokli phosphate iron REE niobium scoping study (PEA)

Rare Earth Element, Niobium, Iron Ore and Phosphate Scoping Study Technical Report.

Kingdom of Saudi Arabia

Phos-3 phosphate project preliminary feasibility study

PHOS-3 Phosphate Project Preliminary Feasibility Study: Efficient industrial minerals open pit mine engineering consulting

Kingdom of Saudi Arabia

Al Jalamid phosphate mine ore reserve estimate

Al Jalamid Phosphate Mine Ore Reserve Estimate Technical Report

Sweden

Kringelgruvan Woxna Mine Graphite PEA

Preliminary Economic Assessment (PEA)

Norway

Kolsvik gold project feasibility study

Bindal Gruver's kolsvik gold project feasibility study: Proven know how results.

Customers Benefits

  • We help you reach new customers and capture new markets.
  • We help you understand the variability within your new customers and manage the uncertainties.
  • We help you know what are the problems out there and build a game plan for the future.
  • We help you innovate and deliver industry-leading value creation.
We'd love to hear from you!

We can't solve your problem if you don't tell us about it! Don't be shy!

Ask an expert

Related services

Mine engineering & operations support

3D machine control integrates the worksite with an intuitive digital solution within your machine's cab to enable operators to perform earthmoving duties with precision and reduce rework.

Mining project evaluation & due diligence

Independent NI 43-101/JORC reviews for M&A and financing across the Nordics & EU. We verify geology, resources, mine plans and economics, assess ESG/permitting, and deliver clear risks, upside and a decision-ready action plan.

Mining project due diligence & independent reviews

Independent NI 43-101/JORC reviews across the Nordics & EU. We verify geology, resources, mine plans and economics, assess ESG/permitting and deliver clear risks, upside levers and an action plan.