Sokli Iron Ore, Phosphate, Rare Earth Elements and Niobium Scoping Study (PEA)

GOSSELIN Mining participated to the updated Preliminary Economic Assessment Technical Report.

Location
Finland
Year
2021-2022
Gosselin Mining - RRE Niobium Iron Ore Phosphate PEA Report - Finland

Summary

GOSSELIN Mining participated to the updated Preliminary Economic Assessment Technical Report (Scoping Study) for this mineral project that is important for EU.

The objective of the mandate was to undertake a Scoping Study in support of mining production and raw material handling. This PEA study inlcuded was prepared in accordance with JORC Code 2012.

Our challenges

Multi-disciplinary technical teams over 18-months updating a multi-element brownfield mineral deposit to a Scoping Study level technical report.

Our solutions

Completed an updated Scoping Study / Preliminary Economic Assessment (PEA) Technical Report for this critical multi-element deposit as classify by EU critical raw material list.

Project highlights

Our experts rwecommended both open pit and underground mining methods, mining fleet. We managed this project within the deadline and to the satisfaction of the client.

Have a similar project?

Contact us and we will help you find the solution for your mineral project

Ask an expert

Related projects

Bergby Lithium Project Technical Report

GOSSELIN Mining prepared a Technical Report in order to satisfy the client's disclosure requirements under National Instrument 43-101 (NI 43-101), for filing a preliminary short form prospectus that contains first time disclosure of, or of a change in, mineral resources, mineral reserves.

Tsagaan Chuluut Uul Fluorspar Project Technical Study

GOSSELIN Mining prepared a Technical Report in order to review the client's internal technical report as per the disclosure requirements under National Instrument 43-101 (NI 43-101).